7 Bedford Row

Restore London have received huge plaudits for their DDA access solution Project at 7 Bedford Row which is a testament to what can be achieved when practicality meets aesthetics. Our team deconstructed the existing entrance structure to form a new aperture to house a powered disabled access solution.

Working closely with our in-house Technical Services Manager and specialist sub-contractor Sesame Access Systems, we installed the completely new lift system. After successfully managing the interfaces between the M&E design, fire system, CCTV and the existing listed building fabrics, the entrance/lift was reclad with new, matching mosaics & Carrara marble. Finally French polishing & redecorations were carried out all to the Client’s delight.


Key Facts

LOCATION

London

DURATION

12 Weeks

CLIENT

7BR Chambers

COMPLETION DATE

Dec 2021

PRINCIPAL CONTRACTOR

Restore London

VALUE

£170K



“Restore London brought a level of quality craftsmanship and skill that is rare in today’s construction market. They worked collaboratively, bringing their wealth of knowledge to every detail. Their contribution to the National Portrait Gallery can be seen wherever you look in the project. ”


Jamie Fobert CBE

Architect, Jamie Fobert Architects