Restore London designed and erected a full working access scaffold to the front of the store to expedite the works and to support the Advertising banner.

The works initially involved exemplar samples and analysis of the existing paint. Once our surveys were completed we removed all ferrous fixtures and fittings and overhauled and consolidated the brick substrate.

Lime render was applied as required in coats and was finished with a Mapei Silan- colour paint.

In addition we carried out lead work, timber repairs, timber replacement and back of house works all to carefully match existing decorations of railings, windows and other features completed the external refurbishment to a very high standard.


Key Facts

LOCATION

New Bond Street

DURATION

12 Weeks

CLIENT

Armani

COMPLETION DATE

May 2017

PRINCIPAL CONTRACTOR

Reflex 4

VALUE

£120K



“It was a pleasure working with the Restore London team. They showed good team spirit coupled by a highly pro-active approach to problem solving & were able to resource the project during unforeseen circumstances, such as the funeral of the late Queen Elizabeth II. The quality of their workmanship was excellent. ”