The Restore London team carried out the cleaning & repair to the existing Bath & Portland stone external façade. We supplied and installed new Bath stone columns to the external façade and new bespoke designed Bath Stone precast spandrel panels.
Restore London also supplied and installed new ceramic tiling to the toilet core and Terrazzo tiles in the main reception of the building.
LOCATION
London, EC1
DURATION
8 Weeks
CLIENT
Mitie Group
COMPLETION DATE
May 2014
PRINCIPAL CONTRACTOR
Mitie Construction
VALUE
£140K
Jamie Fobert CBE
Steve Baldock
Stephen Crampton
Liz Smith
Louise Priestman BA(Hons)
Brian Hutchison
← | Move left |
→ | Move right |
↑ | Move up |
↓ | Move down |
+ | Zoom in |
- | Zoom out |
Home | Jump left by 75% |
End | Jump right by 75% |
Page Up | Jump up by 75% |
Page Down | Jump down by 75% |
This website does not support your current version of Internet Explorer, Please download the recent version from one of the links provided.
Update to Google ChromeUpdate to Internet Edge