Creed Court is a brand-new Curio by Hilton hotel situated in the shadow of St Pauls Cathedral. Following a full façade survey undertaken by our team, façade remedial works to the Ludgate Hill & Creed Lane elevations were undertaken. Works included design, supply & installation of fixings to stone plinths along with plinth installation working alongside Harrison & Goldman.
Decoration works were undertaken including cleaning of flaking paintwork, stucco and render repairs, including to neighbouring buildings and areas where the precast façade adjoined the existing retained façade. A new grand, granite entrance was also formed as part of our works.
LOCATION
St Pauls, London
DURATION
22 Weeks
CLIENT
Curio by Hilton
COMPLETION DATE
March 2022
PRINCIPAL CONTRACTOR
McAleer & Rushe
VALUE
£200K
Jamie Fobert CBE
Steve Baldock
Stephen Crampton
Liz Smith
Louise Priestman BA(Hons)
Brian Hutchison
← | Move left |
→ | Move right |
↑ | Move up |
↓ | Move down |
+ | Zoom in |
- | Zoom out |
Home | Jump left by 75% |
End | Jump right by 75% |
Page Up | Jump up by 75% |
Page Down | Jump down by 75% |
This website does not support your current version of Internet Explorer, Please download the recent version from one of the links provided.
Update to Google ChromeUpdate to Internet Edge