Works included erection of access scaffolding to the courtyard, overcoming restricted loading capacity & access issues ensuring no damage to the building or it’s contents, which included assorted oil paintings, sculptures & antiques.
The ornate Portland stone facades were cleaned using a combination of Doff & JOS Vortech methods, coupled by careful poultice application to the ornate mouldings to remove heavy staining caused by historic water leaching. Stone repairs including replacement Portland stone cills and mouldings, indent repairs, repointing & intricate repairs to ornate mouldings were carried out. All repair & pointing mixes were expertly gauged to match existing & approved by the client following the provision of samples for inspection.
Other works included leadwork & insitu repair & varnishing of hardwood windows to achieve a high gloss finish. During the project noise levels were monitored, controlled & documented to ensure minimal disruption to building occupants. Our works were completed ahead of programme, on budget & to the client’s delight.
LOCATION
London
DURATION
17 Weeks
CLIENT
The Worshipful Company of Drapers
COMPLETION DATE
Sept 2019
PRINCIPAL CONTRACTOR
Restore London Ltd
VALUE
Phase 1 & 2 £213k
Jamie Fobert CBE
Steve Baldock
Stephen Crampton
Liz Smith
Louise Priestman BA(Hons)
Brian Hutchison
← | Move left |
→ | Move right |
↑ | Move up |
↓ | Move down |
+ | Zoom in |
- | Zoom out |
Home | Jump left by 75% |
End | Jump right by 75% |
Page Up | Jump up by 75% |
Page Down | Jump down by 75% |
This website does not support your current version of Internet Explorer, Please download the recent version from one of the links provided.
Update to Google ChromeUpdate to Internet Edge