Harrods

Completed in December 2019, Restore London works included the installation of new retractable fabric awnings on noted elevations and extensive replacement of Terracotta blocks on the Brompton Road elevation. Adaption and modification of the existing structure and existing mechanical, electrical and public health services to allow new awning installation and terracotta remedial works.

Restore London worked with specialist contractors and design teams to develop designs to allow fabrication and installation of the new awnings (CPD). The project required fully designed scaffold to be installed to the full extent of the Brompton Road elevation of Harrods.  These temporary works were hoarded / concealed with a banner so that no element of the scaffold was visible during store trading hours.


Key Facts

LOCATION

Knightsbridge

DURATION

40 Weeks

CLIENT

Harrods Ltd

COMPLETION DATE

Dec 2019

PRINCIPAL CONTRACTOR

Restore London Ltd

VALUE

£2.4M



“Restore London brought a level of quality craftsmanship and skill that is rare in today’s construction market. They worked collaboratively, bringing their wealth of knowledge to every detail. Their contribution to the National Portrait Gallery can be seen wherever you look in the project. ”


Jamie Fobert CBE

Architect, Jamie Fobert Architects