Completed in December 2019, Restore London works included the installation of new retractable fabric awnings on noted elevations and extensive replacement of Terracotta blocks on the Brompton Road elevation. Adaption and modification of the existing structure and existing mechanical, electrical and public health services to allow new awning installation and terracotta remedial works.
Restore London worked with specialist contractors and design teams to develop designs to allow fabrication and installation of the new awnings (CPD). The project required fully designed scaffold to be installed to the full extent of the Brompton Road elevation of Harrods. These temporary works were hoarded / concealed with a banner so that no element of the scaffold was visible during store trading hours.
LOCATION
Knightsbridge
DURATION
40 Weeks
CLIENT
Harrods Ltd
COMPLETION DATE
Dec 2019
PRINCIPAL CONTRACTOR
Restore London Ltd
VALUE
£2.4M
Jamie Fobert CBE
Steve Baldock
Stephen Crampton
Liz Smith
Louise Priestman BA(Hons)
Brian Hutchison
← | Move left |
→ | Move right |
↑ | Move up |
↓ | Move down |
+ | Zoom in |
- | Zoom out |
Home | Jump left by 75% |
End | Jump right by 75% |
Page Up | Jump up by 75% |
Page Down | Jump down by 75% |
This website does not support your current version of Internet Explorer, Please download the recent version from one of the links provided.
Update to Google ChromeUpdate to Internet Edge