Hendon Hall

Working with Farrans Construction, our specialist team carried out works at the Grade II listed Hendon Hall carrying out a series of control samples, whilst procuring matching façade materials to provide seamless brickwork repairs and restoration. These proprietary works were carried out under meticulously recorded controls and in close liaison with both Farrans and the Heritage Team at the London Borough of Barnet. Other works included:

  • Rake out and replace existing tuck pointing
  • Stone repairs/replacement
  • New lead work to cornices and window pediments
  • Replacement rainwater goods
  • External decorations
  • Architectural metalwork
  • Bird protection
  • The repair and reinstatement of 2 no large Portland stone Obelisk’s

Key Facts

LOCATION

Hendon

DURATION

36 Weeks

CLIENT

Signature Care Homes

COMPLETION DATE

Feb 2022

PRINCIPAL CONTRACTOR

Farrans Construction

VALUE

£461K



“Restore London brought a level of quality craftsmanship and skill that is rare in today’s construction market. They worked collaboratively, bringing their wealth of knowledge to every detail. Their contribution to the National Portrait Gallery can be seen wherever you look in the project. ”


Jamie Fobert CBE

Architect, Jamie Fobert Architects
error: <b>Alert:</b> Content is protected !!