Restore London successfully tendered and won the façade repair and restoration works on the High Street Kensington refurbishment Project. Our remit was predominantly to carefully salvage and piece together the removed features of this beautiful brick and stone building.
Initially Restore London’s Management team researched the existing materials and using their in-house library and records found identical matches for both the brick and stone
The retained elements were dry laid and the resultant details transposed onto a working drawing by our Stone Masons, new bricks and stones were measured and ordered as required.
Our Structural Engineer then designed and provided fixings and bracketry to ensure the structures were integrated correctly in to the new façades adequately.
Our craft team re-built the pediments, Porticos and features in line with the original façades – flawlessly matching new with old.
LOCATION
London, W8
DURATION
16 Weeks
CLIENT
English Rose Estates
COMPLETION DATE
May 2017
PRINCIPAL CONTRACTOR
James Taylor Construction
VALUE
£150k
Jamie Fobert CBE
Steve Baldock
Stephen Crampton
Liz Smith
Louise Priestman BA(Hons)
Brian Hutchison
← | Move left |
→ | Move right |
↑ | Move up |
↓ | Move down |
+ | Zoom in |
- | Zoom out |
Home | Jump left by 75% |
End | Jump right by 75% |
Page Up | Jump up by 75% |
Page Down | Jump down by 75% |
This website does not support your current version of Internet Explorer, Please download the recent version from one of the links provided.
Update to Google ChromeUpdate to Internet Edge