Working in partnership with Quad Contracts, the Restore London team carried out brick cleaning & façade repairs to front & rear of this high-end property. Works included repointing, decorations, metal work, balcony repairs, & roof works. A complete refurbishment to the roof included: renewing & redirecting falls to the lead valley gutter, replacement hangers, chimney repairs, & complete renewal of all the Welsh slates. A new lead box gutter to the front parapet & extensive repairs to other leadwork was also completed.
We also demolished & renewed the two rear asphalt terraces including all insulation, leadworks, & new steel balustrades, plus new asphalt to the front balcony together with refurbishment of existing balustrade. A traditional soot wash was undertaken to the front façade (as specified by Westminster Council). We redesigned & replaced the existing front lightwell metal stairs and refurbished the front railings – all works were completed on time and to the exacting quality standards required.
LOCATION
London
DURATION
Across 40 Weeks
CLIENT
Private Client
COMPLETION DATE
Nov 21
PRINCIPAL CONTRACTOR
Quad Contacts
VALUE
£200K
Jamie Fobert CBE
Steve Baldock
Stephen Crampton
Liz Smith
Louise Priestman BA(Hons)
Brian Hutchison
← | Move left |
→ | Move right |
↑ | Move up |
↓ | Move down |
+ | Zoom in |
- | Zoom out |
Home | Jump left by 75% |
End | Jump right by 75% |
Page Up | Jump up by 75% |
Page Down | Jump down by 75% |
This website does not support your current version of Internet Explorer, Please download the recent version from one of the links provided.
Update to Google ChromeUpdate to Internet Edge