Our design team painstakingly surveyed and reproduced individual templates for each radial replacement stone, while our delivery team resourced precise replications of the granite originally used, including our exact texture match.
Our team successfully tracked down the continental quarry concerned and using our network of worldwide agents we controlled and managed the manufacture, transportation, delivery and installation in line with the Clients exacting requirements.
The works also included a new bespoke, state of the art entrance matwell and the coordination of the revolving doors refurbishment, all planned in line with the Client’s quality expectations, phasing and programme requirements. Subsequently further works were instructed including the replacement of the 17th floor lift lobby and various other maintenance and repair projects.
LOCATION
City
DURATION
8 Weeks
CLIENT
IVG Asticus
COMPLETION DATE
May 2013 (further works instructed)
PRINCIPAL CONTRACTOR
Restore London
VALUE
£200K
Jamie Fobert CBE
Steve Baldock
Stephen Crampton
Liz Smith
Louise Priestman BA(Hons)
Brian Hutchison
← | Move left |
→ | Move right |
↑ | Move up |
↓ | Move down |
+ | Zoom in |
- | Zoom out |
Home | Jump left by 75% |
End | Jump right by 75% |
Page Up | Jump up by 75% |
Page Down | Jump down by 75% |
This website does not support your current version of Internet Explorer, Please download the recent version from one of the links provided.
Update to Google ChromeUpdate to Internet Edge