Great care was paramount when undertaking these internal & external works given the building’s Grade II* listed status. External works included compilation of a detailed schedule of works consisting of window repairs, masonry repairs, decorations & leadworks.
Internally, communal areas were stripped & a new fire safety system installed including new emergency lighting & light fittings. The original stone staircase, ground floor & undersides were carefully restored with new Portland stone installed in the entrance lobby areas, complimented by newly French Polished handrails. Walls were re-plastered, lined & decorated. Of particular note, the installation of a new LED strip light to the internal skylight required the design & erection on an internal scaffold managed and procured by Restore London Ltd as Principal Contractor.
LOCATION
London
DURATION
12 Weeks
CLIENT
Earl Kendrick Associates
COMPLETION DATE
June 2019
PRINCIPAL CONTRACTOR
Restore London
VALUE
£200K
Jamie Fobert CBE
Steve Baldock
Stephen Crampton
Liz Smith
Louise Priestman BA(Hons)
Brian Hutchison
← | Move left |
→ | Move right |
↑ | Move up |
↓ | Move down |
+ | Zoom in |
- | Zoom out |
Home | Jump left by 75% |
End | Jump right by 75% |
Page Up | Jump up by 75% |
Page Down | Jump down by 75% |
This website does not support your current version of Internet Explorer, Please download the recent version from one of the links provided.
Update to Google ChromeUpdate to Internet Edge