Oriana

This five-storey, natural stone new build façade install for a well-known High Street brand in the heart of the West End has exceeded all expectations. Restore London were appointed as Specialist Sub-Contractors to construct a completely new Portland Stone Facade in Oxford Street, London. Having worked successfully with our supply chain for the last 20 years including Harrison & Goldman (engineering & design partners), Stainless Steel Fixings (bracketry & fixing supply) & Ranco (one of our preferred natural stone suppliers) – we were confident that we had assembled a winning team for the project & so it proved. Working closely with H&G we were able to provide our Client with a bespoke, highly innovative stainless steel sub-structure system that allowed both the support & restraint of the new 75mm Jordan’s Whitbed stone to what is a relatively light-weight structure.

Our onsite team quickly implemented a robust quality control regime, using our bespoke Project Management software, making for a fast tracked well sequenced install of the natural stonework. Restore London once again have proved their status as a leading stone installer from initial samples, to mock ups through to expert logistical solutions & quality control.

The beauty of the finished facade belies the highly complex design beneath & we are delighted to have been able to assist our Client with this technically demanding scheme.


Key Facts

LOCATION

West End, London

DURATION

Install 18 Weeks

CLIENT

High Street Chain

COMPLETION DATE

April 2022

PRINCIPAL CONTRACTOR

McClaren

VALUE

£750K



“Restore London brought a level of quality craftsmanship and skill that is rare in today’s construction market. They worked collaboratively, bringing their wealth of knowledge to every detail. Their contribution to the National Portrait Gallery can be seen wherever you look in the project. ”


Jamie Fobert CBE

Architect, Jamie Fobert Architects
error: <b>Alert:</b> Content is protected !!